Please enter keyword
HAIHUA INDUSTRY GROUP completed t東西he delivery of ZJ70DB d去子rilling rig project to Russia
2023.04.04
On March 15, 2019, HAIHUA INDU人外STRY GROUP completed t志土he delivery of th南內e ZJ70DB drilling rig pr內男oject of Gazprom.
It took only 7 months fro爸女m the designmanufacture of農數 the drilling rig to the delivery at 工商the final destination, updating th會雜e record of domestic 房服researchdevelopme線還ntdelivery of heavy-duty lo地自w-temperature drilling rigs. It is a醫如lso the Chinese drilling rig us她技ed in the oil field of the Sin算弟o-Russian gas transm影兵ission project.
Cao Zhe, assistant gene弟購ral manager of HAIHUA INDUSTRY GROUP,不機 said in an interview: Against the back又舞drop of the signing of the Wes離習t-East Gas Pipeline Contract betwee拍司n RussiaChina, we have s為就een a broader prospect. HAIHUA INDUSTRY空舊 GROUP also has the abilityc懂著onfidence to bring more Chinese Th厭金e drilling rig is laun你門ched to the international ma冷影rket.
It is believed that strong窗樹 R&Dmanufacturing c高飛apabilities, rich operating experienc錯舊e, superior product perform兒票ance,perfect marketing serv西體ices will continue to promote HAIHUA t可快o play an importan市村t role in the oilgas industry.